21 CENTAURUS METALS LIMITED ANNUAL REPORT 21 CENTAURUS METALS LIMITED ANNUAL REPORT Mineral Resources Classification* Mineral Resources as at 31 December 2025 Mineral Resources as at 31 December 2024 Tonnes Grade Contained Metal Tonnes Grade Contained Metal Mt Ni (%) Cu (%) Co ppm Ni (kt) Cu (kt) Co (kt) Mt Ni (%) Cu (%) Co ppm Ni (kt) Cu (kt) Co (kt) Measured 14.8 1.06 0.07 388 156.1 10.2 5.9 14.0 1.06 0.07 388 156.1 10.2 5.9 Indicated 97.8 0.84 0.06 246 822.8 61.1 24 97.8 0.84 0.06 246 822.8 61.1 24 Inferred 25.7 0.88 0.09 257 225.5 22.9 6.7 25.7 0.88 0.09 257 225.5 22.9 6.7 TOTAL 138.2 0.87 0.07 262 1,204.4 94.2 36.6 138.2 0.87 0.07 262 1,204.4 72.3 36.6 * Within pit limits cut-off grade 0.3% Ni; below pit limits cut-off grade 0.7% Ni; Totals are rounded to reflect acceptable precision; subtotals may not reflect global totals. All oxide material is considered as waste and therefore not reported as Resources. mineral resources are reported inclusive of ore reserves. The Company’s Ore Reserves and Mineral Resource for its iron ore holdings are shown in the following tables. Ore Reserves Project Classification Ore Reserves as at 31 December 2025 Ore Reserves as at 31 December 2024 Jambreiro Iron Ore Project Ore Tonnes Ore Grade Ore Tonnes Ore Grade Mt Fe (%) SiO2 (%) Al2O3 (%) P (%) LOI (%) Mt Fe (%) SiO2 (%) Al2O3 (%) P (%) LOI (%) Proved 30.6 29.4 49.8 4.2 0.04 1.6 30.6 29.4 49.8 4.2 0.04 1.6 Probable 12.7 28.4 49.5 4.7 0.04 2.2 12.7 28.4 49.5 4.7 0.04 2.2 TOTAL 43.3 29.1 49.7 4.4 0.04 1.8 43.3 29.1 49.7 4.4 0.04 1.8 *20% Fe cut-off grade applied; Mine Dilution - 2%; Mine Recovery - 98%; Mineral Resources Deposit Classification Mineral Resources as at 31 December 2025 Mineral Resources as at 31 December 2024 Tonnes Grade Tonnes Grade Mt Fe (%) SiO2 (%) Al2O3 (%) P (%) LOI (%) Mt Fe (%) SiO2 (%) Al2O3 (%) P (%) LOI (%) Jambreiro Project Measured 44.3 29.2 50.5 3.9 0.04 1.6 44.3 29.2 50.5 3.9 0.04 1.6 Indicated 37.7 27.5 51.1 3.7 0.04 1.7 37.7 27.5 51.1 3.7 0.04 1.7 Inferred 45.1 27.3 52.7 3.3 0.05 1.3 45.1 27.3 52.7 3.3 0.05 1.3 TOTAL 127.1 28.0 51.4 3.7 0.05 1.5 127.1 28.0 51.4 3.7 0.05 1.5 Canavial Project* Measured 6.5 33.6 33.6 7.1 0.10 7.9 6.5 33.6 33.6 7.1 0.10 7.9 Indicated 21.1 29.6 38.0 5.7 0.07 5.9 21.1 29.6 38.0 5.7 0.07 5.9 Inferred 27.6 30.5 37.0 6.0 0.07 6.4 27.6 30.5 37.0 6.0 0.07 6.4 TOTAL 6.5 33.6 33.6 7.1 0.10 7.9 6.5 33.6 33.6 7.1 0.10 7.9 Passabém Project** Measured 2.8 33.0 48.8 1.9 0.03 0.6 2.8 33.0 48.8 1.9 0.03 0.6 Indicated 36.2 30.9 54.0 0.7 0.07 0.1 36.2 30.9 54.0 0.7 0.07 0.1 Inferred 39.0 31.0 53.6 0.8 0.07 0.1 39.0 31.0 53.6 0.8 0.07 0.1 TOTAL 2.8 33.0 48.8 1.9 0.03 0.6 2.8 33.0 48.8 1.9 0.03 0.6 TOTAL COMBINED 193.7 29.0 49.8 3.4 0.05 1.9 193.7 29.0 49.8 3.4 0.05 1.9 *20% Fe cut-off grade applied; ** 27% Fe cut-off grade applied Mineral Resources are reported inclusive of Ore Reserves. Totals are rounded to reflect acceptable precision; subtotals may not reflect global totals.
View this content as a flipbook by clicking here.